Job Scope : 

To perform Acis stimulation due to decline in production 

 

Well History : 

Drilled March 2001- FTHP:3800psi FLP:2000PSI 

March 2012; FTHP: 932psi FLP:612psi 

Fishing Operation: Observed carbonates in wire 

May 2013: FTHP 1725psi FLP: 55psi 

August 2014 : FTHP: 232psi FLP: 102psi 

April 2019 : FTHP :93psi FLP=58psi 

 

Design Consideration 

Jetting Nozzle 

Coil Tubing to reach TD – Circa Simulation 

Injector to provide the required pulling capacity as per simulations- TFA Analysis 

Acid Strength – 15%HCL Acid System 

 

 

Chart Explanation 

  • RIH CT & Performed weight checks for every 305m gained. 
  • CT TAG HUD @ 3309m. (Suspected to be an XO from 41/2” Tubing to 31/2” ) 
  • Pumped 10bbl of 10% HCL acid to Pickle Production Tubing and displaced acid with 184bbl of 2% KCL brine 
  • Closet CT/Tubing annulus & performed injectivity Test. 
  • Acid Treatment with 15% HCL Acid Recipe @ 0.8bpm 
  • Commenced Nitrogen Lift Operation @ 2000m 
  • CT park @ 1800 jetting nitrogen with returns of brine and spent acid received on surface  
  • CT on surface; WHP=1365psi. With crude oil returns on surface. 

 

Conclusion 

  • Job was performed successfully with no incident and as per program 
  • Lined up well to flow station with FTHP=1150psi and FLP= 159psi on a choke of 16/64 

 