Cementing Success stories

Job Scope  

 To perform 9-5/8” casing cement job to provide a competent shoe to drilling ahead well to TD 

 

Design Consideration 

5000ft cement column  

15.8 ppg single cement slurry 

Blended Cement; Class G + Silica 

12.55ppg Laminar Space  

Maximum deviation: 3 deg  

BHT = 285degF 

 

Technical Challenges  

High temperature  

Gas migration risk  

SOBM mud removal  

Potential loss circulation  

 

 

Post Job Chart and Explanation  

 

 

Conclusion 

Job was performed successfully as per program with no HSE or SQ incident  

The well successfully drilled to TD  