Primary Cementing Service
We utilize cementing technologies with slurry recipes that can withstand the dynamics of well operations and other disruptions that may occur over time. Zonal isolation is maintained by optimizing fluid loss, rheology, thickening time and compressive strength thereby reducing or eliminating well maintenance and remediation costs.
Remedial Cementing
We provide progressive, custom-made techniques for remedial, well rehabilitation and miscellaneous pumping service needs through casings, drill pipes and coiled tubing, thereby delivering long lasting solutions to well challenges such as communication between zones, casing leaks caused by a corroded or split casing.
Cementing for Well Decommissioning
We provide a wide range of engineered slurries with sealant and expansive properties enabling custom solutions to permanently plug wellbores hence, providing wellbore sealing and protection from aggressive environments or other reservoir fluids that tend to migrate to surface. By this, risks of annular pressure buildup in HPHT wells in environmentally sensitive areas are greatly mitigated.
Loss Circulation
We provide environmentally friendly, easily pumped cement slurries and spacers designed with materials (LCMs) to overcome lost circulation and mitigate moderate to severe losses when cementing across weak, unconsolidated, or fractured formations.
Spacer Solutions
Our spacers are designed to apply in diverse conditions to ensure downhole fluid separation, cleaning, and compatibility. They also meet the needs of Operators dealing with permeable or fractured formations, narrow pore pressure/fracture gradient margins, areas with strict TOC requirements and fields with a history of losses. With these designs, cement fallback is avoided, added costs associated with non-productive time (NPT) and remedial cementing is eliminated.